Case Studies

Desert Palms Mobile Home Park

Hemet, CA

Installed over a megawatt of solar arrays (85% carports) in a challenging environment with extremely tight quarters. Alacrity Energy acted on behalf of the property owner to navigate through many scheduling and layout challenges. Interacted with financial institutions to secure 100% financing of nearly $4,000,000. Alacrity intensively negotiated with the installer and local government on behalf of the property owner bringing all conflicts to favorable conclusions. Alacrity was instrumental in securing over $1,000,000 of unique rebates from the state of California.
CONTACT: MR. RICHARD BLOOM, COMMUNITY-HOUSING MANAGER, DESERT PALMS MOBILE PARK

Hebrew Academy

Huntington Beach, CA

Installed initial 27kW solar system at The Hebrew Academy of Huntington Beach in 2007 and expanded it to 214kW in 2014. The first system was constructed with a combination of donated funds and state rebates. The second phase was funded by a favorable Power Purchase Agreement with a school benefactor. Alacrity facilitated all the details and paperwork for the PPA and arranged funding for the project resulting in a NO COST solution for the Academy and its benefactor.
CONTACT: RABBI YITZCHAK NEWMAN, HEAD OF SCHOOL, HEBREW ACADEMY HUNTINGTON BEACH

A.I.I. Mobile Home Communities

California

Represented A.I.I. in the planning, vetting, funding, and installation process resulting in over 2 MW of solar arrays in 6 active mobile home parks with challenging environments of extremely tight quarters. Secured over $7,000,000 in financing and over $2,000,000 of unique rebates from the state of California.

CONTACT: YANKI GREENSPAN, PRESIDENT, AMUSEMENT INDUSTRIES INC.

Osage Apartments

Inglewood, CA

Installed 58kW of solar energy on 2 roofs in an active apartment complex. Alacrity’s oversight resulted in overcoming challenges from limited roof access, roofing issues, and outdated electrical equipment. Organized low interest funding.
CONTACT: PROSPER KEDOSHIM, VICE PRESIDENT PROPERTY MANAGEMENT, WESTLAND REAL ESTATE GROUP

Ribbon Cutting Ceremony For The New Solar System At Jewish Federation Of Long Beach / Alpert JCC

California

Long Beach, CA Ribbon Cutting ceremony for new solar project at the Jewish Federation/Alpert JCC in Long Beach  CA was performed  at 1PM Sunday March 25th at the Federation 3801 E Willow Street, Long Beach CA.  The Federation was recognizing its appreciation for Alacrity Energy’s vital role in every step in the planning, financing, and installation process, along with the Long Beach Mayor’s support at last year’s gala dinner which helped raise the necessary funds for the installation.   Now the solar array system is complete and represents one of the largest and most advanced solar installations in the city of Long Beach (496kw) with over 1,700 solar panels providing amount of electrical energy equivalent to nearly 100 CA homes.  The installation of the solar array was enhanced with six EV charging stations. The solar structures are prominently displayed facing the highly traveled Willow Street demonstrating the Federation’s ongoing sustainability efforts. “Alacrity Energy engaged multiple committees (over a 2 year+ time-frame) to design an optimize location and size of the solar installation, propose and evaluate funding sources, vetted Federation’s potential installers. Co-chaired the successful solar fundraising drive. Interacted directly with the main donor ($1,000,000+) and his legal & accounting teams to bring the project to fruition. Facilitated the drafting of five separate contractual agreements between the Federation/donor (PPA), donor/installer, and intra-Federation agencies.” Quote from: MRS. DEBRA GOLDFARB, CEO LONG BEACH JEWISH FEDERATION   Yitzy Geisinsky, president of Alacrity Energy LLC remarked: “This installation substantially contributes to improvement of our precious clean environment and we were very happy to provide a truly turn-key service from the initial financial modeling of the project to the ribbon cutting ceremony”.

Jewish Federation Of Long Beach / JCC

Long Beach, CA

Engaged multiple committees (over a 2 year+ time-frame) to design an optimize location and size of the solar installation, propose and evaluate funding sources, vetted Federation’s potential installers. Co-chaired the successful solar fundraising drive. Interacted directly with the main donor ($1,000,000+) and his legal & accounting teams to bring the project to fruition. Facilitated the drafting of five separate contractual agreements between the Federation/donor (PPA), donor/installer, and intra-Federation agencies.
CONTACT: MRS. DEBRA GOLDFARB, CEO LONG BEACH JEWISH FEDERATION

  • Creative Energy Solutions
  • Production And Storage
  • Creative Financing Options
  • Funding Up To 100%
  • End To End Oversight
  • Concept To Completion
  • Maximize Financial Benefits
  • Tax Credits / Rebates / Analysis
  • Specializing In Real Estate Portfolios
  • Quality / Cost Control